Temporary enclosures, generators, electrical phasing and CFO/CFA coordination: EOS Électricité works with works managers and technical directors on construction sites where power conditions both the schedule and site safety.

Overview

Site power thought through as a full installation

Works managers know that a site's power supply conditions its schedule as much as its safety.

Construction sites, temporary sites, industrial events: each context imposes its own autonomy, phasing and safety constraints. EOS designs site power with the same rigour as a permanent installation — load balance, selectivity, standardised enclosures, verified earthing, clear labelling.

Constant rigour

Enclosures, protections and earthing treated as a fixed installation.

Controlled phasing

Electrical breakdown aligned with site phases and CFO/CFA packages.

Responsiveness

Ability to deploy quickly in response to a schedule hazard or outage.

Sector challenges

What construction management faces

Works managers share four recurring families of constraints.

  • No grid connection

    Site without connection or with insufficient supply during early phases.

  • Variable loads

    Consumption evolving with phases: shell, second fix, finishing, commissioning.

  • Site safety

    Enclosures, IP44, differentials and earthing must remain compliant despite the temporary nature.

  • CFO/CFA coordination

    Power, site lighting and communications must be coordinated with the other packages.

Business continuity

Site phasing continuity and temporary redundancy

For a works director, a site halted for electrical reasons costs more than a weather hazard. Continuity is thought through upstream, with temporary redundancy and controlled switching.

Phasing continuity

Sources sized to cover each phase without disruption.

Downtime reduction

Selectivity and isolation to contain a fault without halting the site.

Generator redundancy

Second source available on critical phases.

Planned continuity

Fuel supply, maintenance and documented follow-up for the full duration of the site.

Temporary supply and backup sources rely on our dedicated offerings: see our continuity offerings.

EOS expertise

Construction electrical engineering skills we bring

Our teams work alongside works management, site managers and CFO/CFA coordinators.

Generators

Sizing, sound-insulated selection, fuel supply and supervision.

Temporary enclosures

IP44 enclosures, industrial sockets and standardised mobile distribution.

Earthing

Sized and verified temporary earthing, differential protections suited to the setup.

Electrical phasing

Breakdown aligned with site phases and CFO/CFA packages.

Operational follow-up

Supervision, maintenance and interventions for the whole duration of the operation.

Typical applications on construction and temporary sites

Recurring contexts where our engineers step in.

  • New-build construction sites
  • Major refurbishments and extensions
  • Temporary industrial sites
  • Professional and cultural events
  • Temporary switchovers during grid works
Engineering & regulatory framework

Engineering and construction regulatory framework

Designed with consideration for the regulatory framework applicable to temporary construction-site power, including principles of IP44 enclosures, differential protection and temporary earthing.

  1. 01

    IP44 enclosures

    Standardised enclosures aligned with the principles of weather protection and site use.

  2. 02

    Differential protection

    Segmentation aligned with the principles of personal protection in a construction environment.

  3. 03

    Temporary earthing

    Earth electrodes sized and verified in line with applicable principles.

  4. 04

    Sound-insulated generators

    Equipment choice in line with the principles applicable to noise and urban environment.

  5. 05

    Traceability

    Commissioning documentation and operating logbook handed over at the end of the operation.

Our designs are developed in line with the principles of the applicable regulatory framework. EOS Électricité does not substitute for inspection bodies and does not attest to final compliance, which falls under the verification and commissioning procedures applicable to the project.

Frequently asked questions on construction sites

For your works teams

Request temporary construction power

Tell us about your site, its schedule and your power needs phase by phase. Our engineers come back quickly with a reasoned sizing.

Construction site or temporary site: we can size and deploy your supply quickly.

/en/industries/construction-temporary-sites